Capacity made available through congestion management procedures

Total capacity made available through the application of the congestion management procedures laid down in points 2.2.2, 2.2.3, 2.2.4 and 2.2.5 per applied congestion management procedure.

Interconnection Point  Direction  Congestion Management Procedure  Period Start  Period End  Capacity Made Available (kWh/h)
In the absence of congestion, currently no capacity had to be made available through the application of the congestion management procedures