Total capacity made available through the application of the congestion management procedures laid down in points 2.2.2, 2.2.3, 2.2.4 and 2.2.5 per applied congestion management procedure.
Interconnection Point | Direction | Congestion Management Procedure | Period Start | Period End | Capacity Made Available (kWh/h) |
In the absence of congestion, currently no capacity had to be made available through the application of the congestion management procedures |