Overnomination activated

09.06.2023 19:20

London, 09.06.2023 - 19:20.

Interconnector Limited has activated overnomination at IP IBT-Entry. Overnomination is now possible for this IP for transport period 10.06.2023 - 06:00 - end of gas day.


  23060919-000001-Pos-OvNom_001
  Active
  10/06/2023 06:00:00
 11/06/2023 05:00:00
  09/06/2023 19:20:17
  London, 09.06.2023 - 19:20. Interconnector Limited has activated overnomination at IP IBT-Entry. Overnomination is now possible for this IP for transport period 10.06.2023 - 06:00 - end of gas day.

Download xml.
Back to overview