UK to BE Interruptible Capacity Fully Withdrawn for Gas Day 07 August 2024.

06.08.2024 17:32

Interruptible capacity has been fully withdrawn in the UK to BE direction due to operational conditions upstream of INT’s Bacton Entry Point. 

Back to overview