UK to BE Interruptible Capacity Fully Withdrawn for Gas Day 08 August 2024

07.08.2024 16:30

Interruptible capacity has been fully withdrawn in the UK to BE direction due to operational conditions upstream of INT’s Bacton Entry Point.

Back to overview